SciELO - Scientific Electronic Library Online

 
vol.31 issue6Surgical Treatment for Masseteric Hypertrophy: Case Report with Six-year Follow-upIntra-osseous vascular malformation in the maxilla author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

Related links

  • On index processCited by Google
  • Have no similar articlesSimilars in SciELO
  • On index processSimilars in Google

Share


Revista Española de Cirugía Oral y Maxilofacial

On-line version ISSN 2173-9161Print version ISSN 1130-0558

Abstract

MORAES, E.J. de; BENEVIDES MORAES, N.  and  FARIAS MIRANDA, D.. Clinical Report: Patient's progress one year after being treated with immediate loading bone integrated implants after removal of cementoblastomas. Rev Esp Cirug Oral y Maxilofac [online]. 2009, vol.31, n.6, pp.386-391. ISSN 2173-9161.

The authors present a clinical case of a patient with two cementoblastomas who was treated with four implants installed using Speed Master System. The prosthesis was seated 48 hours after surgery. The clinical and radiographic follow-up was performed 14 months later and it was determined that the implants were in satisfactory conditions.

Keywords : Cementoblastoma; Osseointegraton; Immediate loading.

        · abstract in Spanish     · text in English | Spanish     · English ( pdf ) | Spanish ( pdf )

 

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License